SD42 Carrier 31Y-18-00011
-
Payment
-
Origin
China Mainland
-
Minimum Order
5
-
Packing
Pieces
- Contact Now Start Order
- Description
Product Detail
SHANTUI bulldozer parts are all with good quality and durable,and we supply shantui origianl factory product,make sure the long-time use than other factories and can apply to different kinds of machine .so have got great reputation from all the customers.
Product Description
1. Part Name: SD42 carrier 31Y-18-00011 Shantui bulldozer spare parts heavy machinery spare parts
2. Model No.: we can offer dozer carrier for SD12-SD42
3. Part No.: 31Y-18-00011
4. Keywords:SD42 dozer genuine parts carrier 31Y-18-00011,machinery spare parts
5. High quality With Competitive Price
6. Stock Available
7. 100% Genuine parts
8. Fast delivery: within 3 days after payment got
The hot sale spare parts
Undercarriage Spare Parts | Track shoe, Track link, Bolt, Track roller, Carrier Roller, Sprocket, Front idler, idler Cushion |
Engine spare parts
| Cylinder head, Cylinder block, Turbocharger, Piston, Piston ring, Metal, Crankshaft, Oil pump, Fuel injection pump, Water pump, Alternator, Starting motor |
Hydraulic spare parts | Main Valve, Main Pump, Solenoid Valve, Boom/Arm/ Bucket Cylinder, Final Drive, Travel Motor, Swing Machinery, Swing Motor |
Operator’s Cab spare parts | Cab Ass’y, Monitor, Controller, Engine Controller, Wiring Harness, Seat, Air Conditioner, Air Compressor |
Work equipment | Boom, Arm, Bucket, Bucket teeth, Bucket link, H link |
Cooling system | Radiator, Oil Cooler, Fuel Cooler, Condenser, Fan |
FAQ
Q1. What is your terms of payment?
A: T/T 100% if we have stock. T/T 30% for deposit if we don't stock , 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.
Q2. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU or as your required.
Q3. How about your delivery time?
A: Generally, it will take 3 days if we have stock and1-2 weeks if we don't have stock. The specific delivery time depends on the items and the quantity of your order.
Q4: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
B: 2. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.
- Excavator PC200-8 Injector 0445120231 Engine 6D107 Spare Parts 5 Pieces / (Min. Order)
- Hydraulic Power Loader Gear Pump 705-51-30590 Steering Pump 5 Pieces / (Min. Order)
- Mine Diesel Locomotive 5 Pieces / (Min. Order)
- Dry-mix Gunite Machine 5 Pieces / (Min. Order)
- Tunnel Jet Fan 5 Pieces / (Min. Order)
- Tunnel Axial Fans 5 Pieces / (Min. Order)
- Mining Air Winch 5 Pieces / (Min. Order)
- Mine Scraper Winch 5 Pieces / (Min. Order)
- WA380-6 Carrier 423-22-32662 5 Pieces / (Min. Order)
- WA500-3 Pump Assembly 705-52-30490 5 Pieces / (Min. Order)
- WA380-6 Transmission Assembly 714-12-30003 5 Pieces / (Min. Order)
- WA600-1 Water Pump 6162-63-1014 5 Pieces / (Min. Order)
- WA420-3 Wheel Brake Disc 235-25-11360 5 Pieces / (Min. Order)
- WA420-3 Solenoid Valve 714-10-16951 5 Pieces / (Min. Order)
- WA380-3 Alternator 6742-01-5170 5 Pieces / (Min. Order)
- PC200-7 Crankshaft 6735-01-1310 5 Pieces / (Min. Order)
- PC56-7 Main Metal Assembly KT1A091-0709-3 5 Pieces / (Min. Order)
- PC60-7 Piston 6204-31-2141 5 Pieces / (Min. Order)
- PC200-8 Cylinder Head 6754-11-1101 5 Pieces / (Min. Order)